|
Still working on this one..........under construction.....got a hard hat
on??:
1.
2. 3.
4.
5. 6.
7.
8. 9.
1. Jerry testing the Cl2 residual on our effluent sample..
2. Photo of our settle-o-meters.
3. Side photo of our plant with the sludge truck.
4. Long shot of our aeration basins.
5. Photo of our discharge. This is the point were we check for chlorine
residuals. We never have any, we are "fish" friendly....:)
6. Photo of our headworks.
7. Another photo of our headworks with the "parshall" flume.
8. Photo of our Final basins.
9. Another shot of our effluent discharge mixed with another industry's
effluent on the way to the receiving stream, the "Green" river.
|