  • South Main Street and Sand Lane Water Main Project (2023)

    The Henderson Water Utility (HWU) is starting a project to lay a new water main on South Main Street and Sand Lane in the southern parts of the City of Henderson.  This is part of a larger project to boost water pressure and flow in southern sections of the City.

    More details

  • Pratt Paper Development Projects

HWU and Pratt Paper (KY) LLC entered into an agreement in August 2021 which committed HWU to construct water and wastewater facilities to serve Pratt. Pratt, in return, agreed to use water and sewer services at a high rate of use, and to pay for those services at current HWU rates.

Click Here for details

Past Projects

  • North Water Treatment Plant (NWTP)

Henderson Water Utility (HWU) retained Clark Dietz, Inc. to study options available for various improvements to the North Water Treatment Plant (NWTP).  The NWTP consists of several treatment steps including a raw water intake, rapid mixing, upflow flocculation/clarification (superpulsator) units combined with lamella plate settlers, a contact basin, and filtration for treatment of Ohio River water.

Click Here for details and photos of the NWTP Project.

  • North Wastewater Treatment Plant (NWWTP)

This project is the last LTCP project in the pipeline, and is currently under construction.

Click Here for details and photos of the NWWTP Project.

  • Janalee Drive Pump Station and Force Main Upgrade

This pump station was constructed in 1954 to convey sewage from the Downtown Interceptor sewer to the then-new sewage treatment plant.  Upgrades to pumping capacity, the pump station building, and controls have been made over the years since, but no complete overhaul of this station had ever been attempted.

Click Here for details and photos of the Janalee Drive P.S. and FM Upgrade Project.

  • Tiger Ditch Stormwater Project

This stormwater conveyance on the east side of Henderson had become overgrown with small trees and brush.  In addition, high flows had eroded the sides, and fences and utilities made it difficult for property owners to mow and maintain the ditch banks.

Click Here for details and photos of the Tiger Ditch Stormwater Project.


 Long Term Control Plan (LTCP) Projects

  • Center and Julia Separation Project – Phase II (Early Action Plan)
    (COMPLETED)
  • Ershig Stormwater Line – (Ragan and Green Streets)
    (COMPLETED)
  • Downtown Area Separation Project
    (COMPLETED)
  • Canoe Creek Pumping Station and Interceptor (Phase 2)
    (COMPLETED)
  • WWTP Improvements (Headworks)
    (Scheduled for completion by the September 30, 2015)
  • Canoe Creek Pumping Station and Interceptor (Phase 3)
    (COMPLETED)
  • Canoe Creek Pumping Station and Interceptor (Phase 4)
    (Eliminate this project from the LTCP, Per Amendment 1)
  • Center and Julia Separation Project – Phase III
    (Eliminate this project from the LTCP, Per Amendment 1)
  • System Evaluation
    (ONGOING)