Return to the Combined Sewer System Overview Page
(Closed Loop to Discharge Point KPDES 007)
KPDES = Kentucky Pollutant Discharge Elimination System
CSO = Combined Sewer Overflow
Discharges occur during periods of heavy rain when the Combined Sewer System capacity is reached.
Discharges from the Clay Street Diversion flow through a 15″ dia. conduit to
a common discharge structure with Permitted Outfall 007 – Powell Street.
The CSO Event Summaries of both are included in the CSO Event Summary of Permitted Outfall 007.
Return to the Combined Sewer System Overview Page
CSO Outfall 006 – Clay Street Diversion
|
|||
Calendar Year Ending |
Number of Discharge Occurrences |
Discharge Duration (Hours) |
Estimated Volume (Gallons) |
This information is included with the CSO Outfall 007 – Powell Street tabulation. |
Return to the Combined Sewer System Overview Page