Henderson Water Utility
Water / Wastewater / Stormwater
Menu
Skip to content
Press Release
Education
Fallen Leaves Can Lead to Flooded Streets
Municipal Separate Storm Sewer System (MS4)
Spring Rains and Stormwater Drains
I Didn’t Know That!
PFAS-PFOA Health Advisory Statement
COVID-19
Confined Space Entry
Lead and Copper In Your Drinking Water
Fall Leaf Season
Fats, Oils and Grease (FOG)
Autumn Rains and Stormwater Drains
Pink Stains In Your Toilet Bowl
Fire Hydrant Colors
Why Do We Have Water Towers ?
Repainted Frontier Village Tank
Meter Project
Henderson Water Utility
Submit a Water Quality Complaint
Departments
Water
North Water Plant History and Operation
Ultra-Violet Purification in 1917
South Water Plant History and Operation
Drinking Water Quality
NAEGLERIA FOWLERI and YOUR WATER SYSTEM
Water Quality Archive
Boil Water Advisory
Wastewater
North Wastewater Treatment Plant History
F.E. Stokes South Wastewater Treatment Plant History
Forrest E. Stokes
Wastewater Treatment Plant Regulatory Info.
Pretreatment Program
Combined Sewer System
KPDES 001 – North Wastewater Treatment Plant
KPDES 002 – Janalee Drive Pump Station
KPDES 003 – Ragan Street
KPDES 004 – Jackson Street
KPDES 005 – Towles Street
KPDES 006 – Clay Street
KPDES 007 – Powell Street
KPDES 008 – Washington Street
KPDES 009 – First Street
KPDES 010 – Second Street
KPDES 011 – Fourth Street (CLOSED)
KPDES 012 – Fifth Street (CLOSED)
KPDES 013 – Eighth Street (CLOSED)
KPDES 014 – Second Street Pump Station
KPDES 015 – Third Street Basin
KPDES 016 – Cooper Park Pump Station (CLOSED)
KPDES 017 – Outer Fifth Street (CLOSED)
Stormwater
Permits for MS4 Construction Site Activities
Keeping Stormwater Clean (MS4 Permit)
EPA Stormwater Phase II
Watershed Friendly Stream Maintenance
Admin / Finance
Audit
Audit Archive
Budget
Procurement
Bids
Information Systems
Asset Management
General Manager
Former GMs
Tom Williams, P.E.
Bruce Shipley, P.E.
Bobby G. Gish, P.E.
System Operations Center
Services
Field Crews
GIS
Automation
Engineering
Projects
Pratt
South Main Street and Sand Lane Water Main Project (2023)
North Water Treatment Plant Project
North Wastewater Treatment Plant Project
Janalee Drive Pump Station and Force Main Upgrade Project
Tiger Ditch Stormwater Project
Modeling
Board
Board Duties
Board Members
Board Agenda / Minutes
Governance
Stormwater Requirements for New Development and Redevelopment
Enforcement Response Plans
Ordinances
Technical Standards
Rates and Fees
HWU Policy and Procedure Manual
Long Term Control Plan
HWU Strategic Plan
Strategic Plan Archive
HWU Strategic Plan (April 2020)
HWU Strategic Plan (April 2019)
HWU Strategic Plan (April 2018)
HWU Strategic Plan (April 2017)
HWU Strategic Plan (May 2016)
HWU Strategic Plan (May 2015)
HWU Strategic Plan (June 2014)
Quick Links
Current Road Closures
Live map showing current overflow conditions
City of Henderson Website
Bids
Henderson City-County Web Portal
CountyOffice.org
Board Agenda / Minutes
FOG Policy (Fats, Oils, and Grease)
USGS River Gauge
Hyper-Reach Emergency Communications Network
Kentucky 811
Historic Maps
GovDeals Auction Items
Employee Access to E-Mail
How Do I … ?
How do I apply for services?
How do I get a temporary meter?
How do I report a service problem?
How do I apply for an MS4 Construction Site Permit?
How do I set up a plant tour?
How do I inquire about a job at HWU?
How do I bid on HWU projects?
How do I know if I am responsible for repairing a leak?
How do I get my stormwater problem on the list for work to be done?
How do I determine if I need a permit to perform stream maintenance work?
How do I fill my swimming pool at a lower cost?
Flushing of un-used water lines
River and Creek Levels
Contact Us
Site Map
Site Map (Descriptive)
Search for:
City of Henderson Website
City of Henderson Website